News
DOT bridge crews regularly inspect the gaps in movable bridges to ensure there is enough clearance to open and close them; when there is not enough space, typically, the Coast Guard is notified ...
Plans for a new, movable $1.3 billion bridge in Connecticut are set to get underway after Amtrak awarded a construction contract to Tutor Perini and O&G Industries.
The Richard V. Woods Memorial Bridge in Beaufort is seen Saturday, Aug. 17, 2024. The swing-span bridge, built in 1959, is one of seven remaining movable bridges operating in the state.
Alternate A would be a movable span bridge with a 65-foot clearance that would extend to 135 feet. At $765.9 million, this option is expected to be the most expensive.
PINELLAS COUNTY, Fla. — Pinellas County's three movable bridges will be locked at 8 p.m. Wednesday in preparation for Hurricane Helene, which is expected to reach Category 4 strength before ...
The $75-million project restores the grandeur of Vermont’s only remaining movable bridge—a 60-year-old twin-leaf bascule structure that had exceeded its useful life. Carrying 3,000 vehicles ...
The one Pequonnock River bridge that still gets regular action is the southernmost Stratford Avenue bridge. Built in 1975, that structure is going to be due for some repair shortly.
The Hoan Bridge reconstruction project will be only the second time the Wisconsin Department of Transportation has used movable concrete barriers when rebuilding a highway.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results